Central station, Frankfurt, Slab-strengthening

DUCON (60mm) has been applied as slab-strengthening of the existing platform deck of the Central station in Frankfurt/Main.
The existing screed has been replaced by DUCON, which avoided an increase of the dead load and a change of the door heights.
In addition the new granite stone cover could be placed 2 days after the concrete infiltration.