Projects

Production Plant A, Germany, Slab-strengthening

The change of live-loads, caused by the usage of new fork lifts, required a strengthening of the existing concrete slab. Instead of a demolition and construction of a new concrete slab a 50mm overlay out of DUCON can be applied. The jointless overlay is fully bonded to the existing slab and carries the whole loads and bridges expansion joints.

Are you interested in DUCON-Technology?

Feel free to contact us in order to discuss potential applications and advantages of DUCON for your project.

T +49 6151 30724-0
info@ducon.eu